Commercial strip-out

Commercial strip-out and demolition in Auckland

Cleared properly.Ready for what comes next.

ERC removes the existing interior and prepares the tenancy for what comes next. Controlled strip-outs, commercial de-fits and non-structural demolition clear fixtures, linings and partitions, coordinate waste, and leave the space ready for refurbishment, fitout or handover.

What we remove and prepare

Strip-out and removal

  • Commercial tenancy strip-outs
  • Retail and hospitality de-fits
  • Internal non-structural demolition
  • Partitions, linings and ceiling removal
  • Fixtures, joinery and racking removal

Preparation and handover

  • Floor-finish removal
  • Waste-removal coordination
  • Make-safe and make-good work
  • Enabling works for new fitouts
  • Handover preparation

ERC’s published demolition service focuses on controlled interior strip-out and non-structural demolition. Any broader demolition work is separately scoped and managed.

A controlled start to the next stage.

  1. Existing-condition and scope review

    What is removed, and what stays, is agreed before the strip-out starts.

  2. Services and interface coordination

    Building services and the edges of the work are confirmed with the site team.

  3. Sequenced strip-out

    Fixtures, linings, partitions and ceilings come out in a planned order.

  4. Waste removal and site control

    Waste leaves as the clearance proceeds, and the work area stays under control.

  5. Make-good and handover preparation

    Where it is in scope, the tenancy is made good for the agreed handover condition.

Why ERC for this strip-out

  1. Fitout-aware demolition

    The strip-out is planned by a contractor that also builds commercial interiors.

  2. Controlled commercial-site delivery

    Removal is sequenced on an operating commercial site.

  3. From clearance to make-good

    Make-good can follow the strip-out when it is part of the agreed scope.

  4. Enabling works that can continue

    Where the package includes both, the same contractor can move into the new fitout.

Questions

What is included in a commercial strip-out?

A tenancy strip-out or commercial de-fit removes fixtures, linings, partitions, ceilings and related fitout elements, then prepares the space for its next stage. Waste removal is coordinated as part of that work.

Does ERC undertake structural demolition?

No, not as the published service. ERC focuses on controlled interior strip-out and non-structural demolition. Any broader demolition is separately scoped and managed.

Can ERC complete make-good after the strip-out?

Yes, when make-good is in the scope. That leaves the tenancy in the handover condition that was agreed.

Can ERC continue into the new fitout?

Yes, if the package includes both. The strip-out can lead into the new fitout with the same contractor. It does not have to.

Planning a strip-out?

Talk to ERC about the existing tenancy, removal scope, programme and required handover condition.

Email [email protected] or call 021 056 1392.